Two more rows (sets) of drywall are in. I continue to find little “plumb” problems in the room…
Just in case you need to know: the adjective of plumb I’m talking about is “at right angles to the plane of the horizon or a base line”. Something the carpenter’s that built our house should have paid attention to, evidently.
I hope to finish dry-walling the west wall, get 4 more feet of joists in, get the last lights installed up in those joists – by the end of this week. This should mean that we can rearrange the former occupants of this room, such as refrigerator and freezer movement, throwing out more stuff, keeping what we want to keep, and not having to worry about rain, animals, or the yard people. Taping/plastering, painting, carpeting may take the next couple of months, time permitting, and we’ve decided to do the sliding glass door in the spring…
1 comment:
Tom,
You are doing a fabulous job. You can come do my garage anytime. Love the supports for installiong the ceiling dry wall.