A bit more progress on the tackroom project - I have most of the siding installed on the outside wall. I've been working inside as well, with the insulation of the walls finished and then a few sheets of drywall up and installed.
I found out that the room is not square, oh surprise, surprise. I think the height of the west wall is about 3 inches shorter than the east wall... Oh, well, it was just a garage, right?
I have 2 of the recessed ceiling light fixtures installed and wired, I'll probably apply power to this circuit in the next day or so, which will improve lighting as I continue to work :-)